friendsoftheriverteign.org ↗Log in
← Pathfinder pumping station, Tedburn St Mary

Spill evidence · Friends of the River Teign

Pathfinder pumping station, Tedburn St Mary

Pumping station overflow · SBB00913 · feeds TEDBURN ST MARY system
Wet weather

The discharge

Spill day
Saturday, 20 February 2021
Started
20 Feb 2021, 04:17
Ended
20 Feb 2021, 17:49
Duration
13 hours 32 minutes
Receiving water
—
Parish
—

Rainfall evidence

Daily rainfall at the matched gauge (Mardon Down) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
20/02/2021 (spill day)20.2 mmrain
19/02/202136 mmrain
18/02/20214 mmrain
17/02/202117.3 mmrain
16/02/20216.3 mmrain

River flow that day: 54.156 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 7.8 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00913). Rainfall: EA Hydrology gauge 323b21d8-c9a4-4681-bc5c-62d7337993ac. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Teign Data.